GTU Diploma Question Paper | Past Paper | Diploma Engineering |: Summer 2015 Industrial Management Question Paper

Enter Subject Code And Search Question Paper

Summer 2015 Industrial Management Question Paper

***************

GUJARAT TECHNOLOGICAL UNIVERSITY
DIPLOMA ENGINEERING – SEMESTER – I • EXAMINATION – SUMMER 2015
Subject Code: 3361903  Date:06-05-2015
Subject Name: Industrial Management
Time: 10:30am to 1:00pm            Total Marks: 70

Instructions:
1.  Attempt all questions.
2.  Make Suitable assumptions wherever necessary.
3.  Figures to the right indicate full marks.
4.  Use of programmable & Communication aids are strictly prohibited.
5.  Use of only simple calculator is permitted in Mathematics.
6.  English version is authentic.

**************

Q.1 Answer any seven out of ten.  14

1. Define system.

2. Give definition of span of control.

3. What are the factors influencing job satisfaction.

4. Define value analysis and list the methods.

5. What is application of ERP (Enterprise Resource Planning)?

6 Give four benefits of just in time (JIT) concept.

7. Give definition of CPM & PERT.

8.What is economic order quantity(EOQ)

9. List functions of storekeeper.

10. What is crashing of network.

Q.2  (a)What is updating of network & how it is done?  03

OR

(a)Explain the dummy activity with reference to network analysis.  03

(b)   What is material management and list the four popular methods of material management evaluation.  03

OR

(b)List the principles of organization and explain any one.  03

(c)  Define Inventory control, List the objectives of inventory control   04

OR

(c)  Write short note on “ABC analysis concept”.  04

(d) Differentiate between “line” and “line and staff” organization.  04

OR

(d)List the advantage of concept of scientific management.  04

Q.3  (a)  List the characteristics of MS project.   03

OR

(a)  Write short note on “two bin” model of inventory control.  03

(b)   What is need of “Production Planning and Control” (PPC)?   03

OR

(b)Explain “DARISIRI” method of value analysis.  03

(c) List the popular methods of cost control and explain any one method.   04

OR

(c)Draw network diagram & determine the critical path from the following data  04


(d)State advantage& disadvantage of centralized storing V/S decentralized storing.   04

OR

(d)Explain following terms with reference to purchasing . a) FOB or FOR price   b) F.A.S price   04

Q.4(a)  What is necessity of labor laws?  03

OR

(a) Illustrate four types of float.  03

(b)  With reference to following data find the EOQ   04
a) average annual requirements = 12000 units
b) ordering cost = 45 Rs per order
c) cost per unit = 20
d) inventory carrying cost = 15 % of unit cost .

OR

(b)  List the various types of inventory control model and explain any one model in brief.  04

(c)  Explain following terms with reference to PPC. a) routing   b) scheduling   c) dispatching   07

Q.5  (a)   Give list of various objectives of Value Analysis and Explain questionnaire technique of Value analysis.  04

(b)  Explain various types of production system with examples.  04

(c) List out the factors influencing morale of employee.  03

(d)  State the advantage of decentralization of authority in industry.  03

**************

No comments:

Post a Comment