GTU Diploma Question Paper | Past Paper | Diploma Engineering |: 3361903

Enter Subject Code And Search Question Paper

Showing posts with label 3361903. Show all posts
Showing posts with label 3361903. Show all posts

Industrial Management previous year question paper | 3361903 |



 


What advantage can you take with gtu previos Exam Papers?

Exams appear to be a mystery to most students but some may find it exciting by looking at it as a competition. They pray about having a perfect dream about the coming test so that they already know it but that is not a reality truth is if you wants to succeed you have to prepare well for the exams.

Studying past papers are a valuable part of exam preparation and help keep revision focused on important themes whilst practicing exam style questions.

One of the simplest ways to prepare for the exams is to manage your study according to a well-defined time table and allot time to every subject. It is a good practice to compare the questions of the examiners because it will give a better idea about what the examiner is looking for in the exam.

 Technique for Studying gtu previos Exam Papers

Most of the universities keep copies of the past exams in their libraries or they can also be accessed from the university websites available on the internet. A good practice is to take past five year papers and, instead of going through the past exam paper year by year, find questions about the same topic and prepare that topic really well. This technique can be very helpful for preparing the exam.

Advantages of Studying gtu previos Exam Papers

One of the most important part of exam preparation is going through past exams. It is important  to revise your entire syllabus quickly. They can provide you the general idea of the upcoming paper and you could easily guess the important topics of a particular subject. Past exam papers give you the idea of number of questions and the available choices. It is therefore necessary for students to give some time to go through the past paper while revising a subject.

Past exam papers are one of the most helpful tools available to prepare for both internal and external examinations as they provides students with practical insight into how the forthcoming exam paper is likely to look and the key themes or subject areas most likely to be covered. Before starting revision for a subject it is always worth taking time to seek out past papers.


Summer 2015 Industrial Management Question Paper

***************

GUJARAT TECHNOLOGICAL UNIVERSITY
DIPLOMA ENGINEERING – SEMESTER – I • EXAMINATION – SUMMER 2015
Subject Code: 3361903  Date:06-05-2015
Subject Name: Industrial Management
Time: 10:30am to 1:00pm            Total Marks: 70

Instructions:
1.  Attempt all questions.
2.  Make Suitable assumptions wherever necessary.
3.  Figures to the right indicate full marks.
4.  Use of programmable & Communication aids are strictly prohibited.
5.  Use of only simple calculator is permitted in Mathematics.
6.  English version is authentic.

**************

Q.1 Answer any seven out of ten.  14

1. Define system.

2. Give definition of span of control.

3. What are the factors influencing job satisfaction.

4. Define value analysis and list the methods.

5. What is application of ERP (Enterprise Resource Planning)?

6 Give four benefits of just in time (JIT) concept.

7. Give definition of CPM & PERT.

8.What is economic order quantity(EOQ)

9. List functions of storekeeper.

10. What is crashing of network.

Q.2  (a)What is updating of network & how it is done?  03

OR

(a)Explain the dummy activity with reference to network analysis.  03

(b)   What is material management and list the four popular methods of material management evaluation.  03

OR

(b)List the principles of organization and explain any one.  03

(c)  Define Inventory control, List the objectives of inventory control   04

OR

(c)  Write short note on “ABC analysis concept”.  04

(d) Differentiate between “line” and “line and staff” organization.  04

OR

(d)List the advantage of concept of scientific management.  04

Q.3  (a)  List the characteristics of MS project.   03

OR

(a)  Write short note on “two bin” model of inventory control.  03

(b)   What is need of “Production Planning and Control” (PPC)?   03

OR

(b)Explain “DARISIRI” method of value analysis.  03

(c) List the popular methods of cost control and explain any one method.   04

OR

(c)Draw network diagram & determine the critical path from the following data  04


(d)State advantage& disadvantage of centralized storing V/S decentralized storing.   04

OR

(d)Explain following terms with reference to purchasing . a) FOB or FOR price   b) F.A.S price   04

Q.4(a)  What is necessity of labor laws?  03

OR

(a) Illustrate four types of float.  03

(b)  With reference to following data find the EOQ   04
a) average annual requirements = 12000 units
b) ordering cost = 45 Rs per order
c) cost per unit = 20
d) inventory carrying cost = 15 % of unit cost .

OR

(b)  List the various types of inventory control model and explain any one model in brief.  04

(c)  Explain following terms with reference to PPC. a) routing   b) scheduling   c) dispatching   07

Q.5  (a)   Give list of various objectives of Value Analysis and Explain questionnaire technique of Value analysis.  04

(b)  Explain various types of production system with examples.  04

(c) List out the factors influencing morale of employee.  03

(d)  State the advantage of decentralization of authority in industry.  03

**************

Winter 2015 Industrial Management Question Paper

***************

GUJARAT TECHNOLOGICAL UNIVERSITY
DIPLOMA ENGINEERING – SEMESTER –VI • EXAMINATION – WINTER 2015
Subject Code: 3361903    Date: 08/12/2015
Subject Name: Industrial Management
Time: 02:30 PM TO 05:00 PM   Total Marks: 70

Instructions:
1.  Attempt all questions.
2.  Make Suitable assumptions wherever necessary.
3.  Figures to the right indicate full marks.
4.  Use of programmable & Communication aids are strictly prohibited.
5.  Use of only simple calculator is permitted in Mathematics.
6.  English version is authentic.

******************

Q.1 Answer any seven out of ten.  14

1.  State the function of management and explain any one in brief.

2.  List the types of systems and show any two on line diagram.

3.  List the types of floats of the network diagram and define any two.

4.  Define: optimistic time (to), most likely time (tm), pessimistic time (tp).

5.  List various direct and indirect materials.

6.  Make list of various types of forms used by purchase engineer.

7.  List the functions of PPC and explain the importance of routing.

8.  Explain the significance of critical ratio of production scheduling if CR <1, CR=1, CR>1.

9.  Define the term value. List various types of values and explain any two in brief.

10.  List the benefits of JIT (Just in time).

Q.2  (a)  Define the term scientific management and state associated principles and explains any two in brief.   03

OR

(a)  Explain system behavior (neo classical theory of management).  03

(b)  List the factors affecting in formulating organizational structure.  03

OR

(b)  List the effect of morale in industries.  03

(c)  Define critical path of network diagram.   04

OR

(c)  Compare the CPM and PERT.  04

(d)  Define following terms: (1) event, (2) activity, (3) EPO and (4) LPO  04

OR

(d)  Why network requires updating explain in brief.  04

Q.3  (a)  List the important functions of material management.  03

OR

(a)  List various purchasing systems and explain speculative purchasing.   03

(b)  State the advantages and disadvantages of centralized store keeping.   03

OR

(b)  Explain the following terms: (1) EOQ, (2) lead time, (3) cycle time and (4) safety stock.  03

(c)  Differentiate between continuous and intermittent production.  04

OR

(c)  Write short note on economic batch size.  04

(d)  List the benefits of supply chain management.   04

OR 

(d)  List the important features of MS projects.  04

Q.4  (a)  Draw the network diagram based on the following details and decide critical path.  03


OR

(a)  From the data given prepare network diagram and calculate EPO and LPO at each mode.  03


(b)  Explain the importance of inventory control.  04

OR

(b)  Explain ABC analysis.  04

(c)  Explain the importance of scheduling in PPC.  07

Q.5  (a)  Given the data prepare the scheduling using Gantt chart.Component - Φ25, 100 mm long full threaded M25 threaded studMaterial- MS Φ25 bright barBatch size- 300/ shift  07

(b)  Write short note on DARSIRI method of value analysis.  04

(c)  What is logistics? State its concepts, need and benefits.   03

*****************

Summer 2016 Industrial Management Question Paper

***************

GUJARAT TECHNOLOGICAL UNIVERSITY
DIPLOMA ENGINEERING – SEMESTER – VI• EXAMINATION – SUMMER 2016
Subject Code: 3361903  Date: 16/05/2016
Subject Name: Industrial Management
Time: 10:30 AM to 01:00 PM  Total Marks: 70

Instructions:
1.  Attempt all questions.
2.  Make Suitable assumptions wherever necessary.
3.  Figures to the right indicate full marks.
4.  Use of programmable & Communication aids are strictly prohibited.
5.  Use of only simple calculator is permitted in Mathematics.
6.  English version is authentic.

*****************

Q.1 Answer any seven out of ten.  14

1.  Define system.

2.  Define management.

3.  Define critical path method.

4.  State benefits of Just in Time (JIT) any two.

5.  Definition of material management.

6.  Give “Objectives of Purchasing”.

7.  Definition of production planning and control.

8.  Write phases of Production Planning and Control (PPC).

9.  State important terms of value analysis. 

10.  What is ERP (Eenterprise resource planning)?

Q.2  (a)  List benefits of production planning.  03

OR

(a)  Explain job order production system.  03

(b)  State important features of MS Project.  03

OR

(b)  State benefits of supply chain management.  03

(c)  State types of system and explain any one.  04

OR

(c)  State necessity for the industrial laws.  04

(d)  Explain any two factors considered in formatting the organization structure.  04

OR

(d)  Explain – Budgeting.  04

Q.3  (a)State similarities between CPM and PERT  03

OR

(a)  State main characteristics of critical path method-CPM.  03

(b)  State difference between Gantt chart and net-work diagram.     03

OR

(b)  Understand advantages of network diagram.  03

(c)  List ways to reduce material wastage and explain any one. 04

OR

(c)  List functions of materials management  04

(d)  Purchase procedure is very important in the purchasing activity- Explain.   04

OR

(d)  Explain important of Material Requirement Planning (MRP).   04

Q.4  (a)  Write Objective of Production Planning & Control.   03

OR

(a)  Economic batch Quantity – explain in short.  03

(b)Understand Gantt chart.   04

OR

(b)Understand “scheduling” in Production planning and control.  04

(c)  One project consist seven activities from P to V, related information given below,


Draw network diagram and find critical path.   07

Q.5  (a)  State techniques of value analysis and seven logical steps of DARSIRI technique.  04

(b)  State types of production and explain any one.   04

(c)  Inventory control is very useful. Explain.  03

(d)  State terms used in network diagram and explain any one.  03

****************

Winter 2016 Industrial Management Question Paper

***************

GUJARAT TECHNOLOGICAL UNIVERSITY
Diploma Engineering - SEMESTER–VIII • EXAMINATION – WINTER • 2016
Subject Code: 3361903  Date: 24-10-2016
Subject Name: Industrial Management
Time: 10:30 am - 01:00 pm  Total Marks: 70

Instructions:
1.  Attempt all questions.
2.  Make Suitable assumptions wherever necessary.
3.  Figures to the right indicate full marks.
4.  Use of programmable & Communication aids are strictly prohibited.
5.  Use of only simple calculator is permitted in Mathematics.
6.  English version is authentic.

******************

Q.1 Answer any seven out of ten.  14

1.  List the factors affecting moral.

2.  Explain the significance of factory acts.

3.  Explain the application of critical path in network analysis.

4.  Give the full name of CPM and PERT in network.

5.  How ABC analysis is useful in inventory control?

6.  List the types of recording tools used in stores management.

7.  Explain the basic functions of PPC.

8.  Explain your view point for critical ratio scheduling technique.

9.  List different values and explain any two in an industrial situation.

10.  List benefits of logistics in supply chain management.

Q.2  (a)  Explain the advantages of division of labour.  03

OR

(a)  List the factors influencing job satisfaction of workmen.   03

(b)  List the factors considered for system design.  03

OR

(b)  Explain the importance of centralized authority delegation.  03

(c)  How the float affects the critical path in network?  04

OR

(c)  Differentiate CPM and PERT.    04

(d)  How and why the network is updated (network updating)?  04

OR

(d)  Explain in brief the following terms used in network diagram.(1)  Event (2) Activity (3) Dependency and (4) Dummy activity   04

Q.3  (a)  List different material handling equipments.  03

OR

(a)  Explain the steps followed in material purchase.   03

(b)   Derive the EOQ with usual notations.  03

OR

(b)  On the basis of ABC analysis design suitable product for effective inventory control with a view to reduce fi nancial fluidity and to increase profitivity.  03

(c)  Differentiate job order production system and continuous production system.    04

OR

(c)  List the functions of PPC and explain follow up or expediting in brief.  04

(d)  Explain the characteristics of JIT.  04

OR

(d)  Explain the application of ERP under a virtual practical situation.  04

Q.4  (a)  How effective scheduling helps in raising productivity and resource utilization.  03

OR

(a)  Draw symbols used in Gantt chart and describe any three with respect to the function.   03

(b)  List the various purchasing systems used and explain speculative purchasing in  brief.   04

OR

(b)  Define material management and State the direct material and indirect material.   04

(c)  From Following data, prepare network diagram and determine critical path.   07


Q.5  (a)  Using following data prepare Gantt chart for scheduling.  04


              Assumptions:  (1)  there  are  four  work  centers  (2)  during  the  production
             different jobs passes through all work  (3) there is one workmen and there are
             two machines.
             You may use the format A.   (Format A)


(b)  State the ways to control waste in industry.  04

(c)  List the software included in ERP.  03

(d)  Explain the importance of value analysis in industry.  03

******************