GTU Diploma Question Paper | Past Paper | Diploma Engineering |: Winter 2016 Industrial Management Question Paper

Enter Subject Code And Search Question Paper

Winter 2016 Industrial Management Question Paper

***************

GUJARAT TECHNOLOGICAL UNIVERSITY
Diploma Engineering - SEMESTER–VIII • EXAMINATION – WINTER • 2016
Subject Code: 3361903  Date: 24-10-2016
Subject Name: Industrial Management
Time: 10:30 am - 01:00 pm  Total Marks: 70

Instructions:
1.  Attempt all questions.
2.  Make Suitable assumptions wherever necessary.
3.  Figures to the right indicate full marks.
4.  Use of programmable & Communication aids are strictly prohibited.
5.  Use of only simple calculator is permitted in Mathematics.
6.  English version is authentic.

******************

Q.1 Answer any seven out of ten.  14

1.  List the factors affecting moral.

2.  Explain the significance of factory acts.

3.  Explain the application of critical path in network analysis.

4.  Give the full name of CPM and PERT in network.

5.  How ABC analysis is useful in inventory control?

6.  List the types of recording tools used in stores management.

7.  Explain the basic functions of PPC.

8.  Explain your view point for critical ratio scheduling technique.

9.  List different values and explain any two in an industrial situation.

10.  List benefits of logistics in supply chain management.

Q.2  (a)  Explain the advantages of division of labour.  03

OR

(a)  List the factors influencing job satisfaction of workmen.   03

(b)  List the factors considered for system design.  03

OR

(b)  Explain the importance of centralized authority delegation.  03

(c)  How the float affects the critical path in network?  04

OR

(c)  Differentiate CPM and PERT.    04

(d)  How and why the network is updated (network updating)?  04

OR

(d)  Explain in brief the following terms used in network diagram.(1)  Event (2) Activity (3) Dependency and (4) Dummy activity   04

Q.3  (a)  List different material handling equipments.  03

OR

(a)  Explain the steps followed in material purchase.   03

(b)   Derive the EOQ with usual notations.  03

OR

(b)  On the basis of ABC analysis design suitable product for effective inventory control with a view to reduce fi nancial fluidity and to increase profitivity.  03

(c)  Differentiate job order production system and continuous production system.    04

OR

(c)  List the functions of PPC and explain follow up or expediting in brief.  04

(d)  Explain the characteristics of JIT.  04

OR

(d)  Explain the application of ERP under a virtual practical situation.  04

Q.4  (a)  How effective scheduling helps in raising productivity and resource utilization.  03

OR

(a)  Draw symbols used in Gantt chart and describe any three with respect to the function.   03

(b)  List the various purchasing systems used and explain speculative purchasing in  brief.   04

OR

(b)  Define material management and State the direct material and indirect material.   04

(c)  From Following data, prepare network diagram and determine critical path.   07


Q.5  (a)  Using following data prepare Gantt chart for scheduling.  04


              Assumptions:  (1)  there  are  four  work  centers  (2)  during  the  production
             different jobs passes through all work  (3) there is one workmen and there are
             two machines.
             You may use the format A.   (Format A)


(b)  State the ways to control waste in industry.  04

(c)  List the software included in ERP.  03

(d)  Explain the importance of value analysis in industry.  03

******************

No comments:

Post a Comment